Test & measurement · Infrared sensing+886 2 8797 1799

VIGO PHOTONICS · SMART TAIWAN

Infrared components for security and monitoring

For development work involving background radiation, fast optical signals and multi-channel readout. Define measurable optical and environmental requirements before evaluating MWIR detectors and integration components.

Define the measurement requirements

Requirements to define
Task / signalTarget signal, background and required spectral band
Optical conditionsIncident power, field of view, target size and optical coupling
ReadoutElement geometry, signal bandwidth, synchronisation and output
Environment / thermalOperating temperature, vibration, heatsinking and TEC stability
Qualification / supplyPrototype test conditions, document revision and supply requirements

Selection and integration considerations

  • Compare spectral response, element layout and DC / AC response before selecting an architecture.
  • Listed application directions do not establish qualification of a complete system in a particular scenario.
  • For imaging or complete monitoring systems, define responsibilities for optics, readout and software before setting the support scope.

Products to evaluate

These are starting points for discussion; suitability depends on the requirements above.

32EM-5-01

32EM-5-01 32-channel HgCdTe MWIR module

Multi-point temperature monitoring, spectroscopy and multi-channel gas-measurement development with suitable optics, readout and calibration.

32MM-5

32MM-5 32-channel InAsSb MWIR module

Multi-point MWIR sensing, spectroscopy and gas-analysis development, selected by element geometry, bandwidth and readout requirements.

PVIA-4TE-10-1x1-TO8-wZnSeAR-36

PVIA-4TE-10 infrared detector

FTIR, longer-wavelength spectroscopy and CO₂ laser measurements within the documented optical-power and linearity limits.

Original English documents and resources

Start with your measurement requirements

Share the model or application, wavelength, signal bandwidth, quantity and desired schedule. Unknown items can be discussed during selection.

Submit a VIGO inquiry